Road Conditions | SummitDaily.com

Road Conditions


List View Grid View
  • Road
    Conditions
    Updated
    Hazard
    Alert
  • Rifle -Glenwood Springs
    Dry
    57 minutes ago
    No
    ROAD ALERT:Rifle -Glenwood SpringsEast : 970 989-3860
    Road Work
    MM126
    MM116
    I-70 Eastbound / Westbound 970 989-3860 (Milemarker 126-116) (through October 2019)
    Xcel Energy will be replacing and repairing transmission and distribution structures over the summer and fall of 2019 in the Glenwood Canyon and in areas within the White River National Forest. The work will take place between the Shoshone Hydroelectric Plant and the City of Glenwood Springs between June and October.
    ROAD ALERT:Rifle -Glenwood SpringsEast : on the west end of the Glenwood Canyon
    Road Work
    MM106
    MM116
    I-70 Eastbound / Westbound on the west end of the Glenwood Canyon (Milemarker 106-116) (through September 2019)
    Removing the existing pavement, expanding the parking area, regrading, repaving with concrete, guardrail and embankment work. Restrooms will also be installed at the mile point 107.5 parking area that serves as boater access to the Colorado River.
    ROAD ALERT:Rifle -Glenwood SpringsEast : I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County
    Road Work
    MM116
    MM132
    I-70 Eastbound / Westbound I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County (Milemarker 116-132) (through December 2019)
    The project will consist of: • installing three weather stations for live monitoring and reporting of weather conditions; • installing 73 standard static signs; • installing 17 new dual, variable speed limit signs; • replacing five single variable speed limit signs; • removing 38 existing static signs; • installing nine closed-circuit cameras for live monitoring and viewing of roadway conditions; • adding other surface and subsurface conduit, and related improvements to guide the display of the variable speed limits. This section of I-70 experiences a range of weather conditions throughout the year, causing unsafe conditions for drivers who don't take proper precautions. The new signs will: • give drivers advance warning and generate a safer traffic flow to decrease accidents in the canyon. • increase the standard speed limit during good conditions to 60 mph compared to 50 mph in most areas of the canyon. • lower the speed limit to assist with incident management, conditions created by inclement weather, and maintenance and construction.
  • Glenwood Springs-Eagle
    Dry
    57 minutes ago
    No
    ROAD ALERT:Glenwood Springs-EagleEast : 970 989-3860
    Road Work
    MM126
    MM116
    I-70 Eastbound / Westbound 970 989-3860 (Milemarker 126-116) (through October 2019)
    Xcel Energy will be replacing and repairing transmission and distribution structures over the summer and fall of 2019 in the Glenwood Canyon and in areas within the White River National Forest. The work will take place between the Shoshone Hydroelectric Plant and the City of Glenwood Springs between June and October.
    ROAD ALERT:Glenwood Springs-EagleEast : Hanging Lake Tunnels on I-70 between Gypsum and Glenwood Springs.
    Road Work
    MM125
    MM126
    I-70 Eastbound / Westbound Hanging Lake Tunnels on I-70 between Gypsum and Glenwood Springs. (Milemarker 125-126) (through December 2019)
    Remove and replace the vertical lift doors in the Hanging Lake Tunnel complex.
    ROAD ALERT:Glenwood Springs-EagleEast : I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County
    Road Work
    MM116
    MM132
    I-70 Eastbound / Westbound I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County (Milemarker 116-132) (through December 2019)
    The project will consist of: • installing three weather stations for live monitoring and reporting of weather conditions; • installing 73 standard static signs; • installing 17 new dual, variable speed limit signs; • replacing five single variable speed limit signs; • removing 38 existing static signs; • installing nine closed-circuit cameras for live monitoring and viewing of roadway conditions; • adding other surface and subsurface conduit, and related improvements to guide the display of the variable speed limits. This section of I-70 experiences a range of weather conditions throughout the year, causing unsafe conditions for drivers who don't take proper precautions. The new signs will: • give drivers advance warning and generate a safer traffic flow to decrease accidents in the canyon. • increase the standard speed limit during good conditions to 60 mph compared to 50 mph in most areas of the canyon. • lower the speed limit to assist with incident management, conditions created by inclement weather, and maintenance and construction.
  • Eagle-Vail
    Scattered Showers
    57 minutes ago
    Yes
    ROAD ALERT:Eagle-VailEast : in Eagle County between Avon and Vail, Colorado
    Road Work
    MM166
    MM174.5
    I-70 Eastbound / Westbound in Eagle County between Avon and Vail, Colorado (Milemarker 166-174.5) (through October 2019)
    Resurfacing, guardrail work, bridge rail work, bridge joint repair, and erosion control
    ROAD ALERT:Eagle-VailEast : I-70 at the interchange with US 24 west of Vail, and from east of the Big Horn Road interchange to west of the Shrine Pass interchange.
    Road Work
    MM171.05
    MM187
    I-70 Eastbound / Westbound I-70 at the interchange with US 24 west of Vail, and from east of the Big Horn Road interchange to west of the Shrine Pass interchange. (Milemarker 171.05-187) (through October 2019)
    Constructing various types of wall repairs and drainage to increase safety and maintain and enhance the structural integrity of the existing wall infrastructure.
  • Vail-Vail Pass
    Snow
    57 minutes ago
    Yes
    ROAD ALERT:Vail-Vail PassEast : I-70 at the interchange with US 24 west of Vail, and from east of the Big Horn Road interchange to west of the Shrine Pass interchange.
    Road Work
    MM171.05
    MM187
    I-70 Eastbound / Westbound I-70 at the interchange with US 24 west of Vail, and from east of the Big Horn Road interchange to west of the Shrine Pass interchange. (Milemarker 171.05-187) (through October 2019)
    Constructing various types of wall repairs and drainage to increase safety and maintain and enhance the structural integrity of the existing wall infrastructure.
    ROAD ALERT:Vail-Vail PassEast : in Denver Metro Area
    Road Work
    MM184
    MM286
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 184-286) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Vail-Vail PassWest : between Vail and Copper Mountain
    Restriction
    MM178
    MM195
    I-70 Westbound / Eastbound between Vail and Copper Mountain (Milemarker 178-195)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
  • Vail Pass-Copper Mtn
    Snow
    57 minutes ago
    Yes
    ROAD ALERT:Vail Pass-Copper MtnWest : between Vail and Copper Mountain
    Restriction
    MM178
    MM195
    I-70 Westbound / Eastbound between Vail and Copper Mountain (Milemarker 178-195)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
  • Copper Mtn-Silverthorne
    Icy Spots
    57 minutes ago
    Yes
    ROAD ALERT:Copper Mtn-SilverthorneEast : from Officers Gulch to Frisco
    Road Work
    MM197
    MM202.5
    I-70 Eastbound / Westbound from Officers Gulch to Frisco (Milemarker 197-202.5) (through December 2019)
    Resurface a 5-mile stretch of I-70, from Officers Gulch to Frisco (MP 197.5-202.5), with a 2.5” mill and a 2” fill of highway and a portion of Frisco Main Street, removal and replacement of guardrail along I-70, replacement of ADA-compliant ramps at Frisco Main Street.
  • Silverthorne-Eisenhower/Johnson tunnels
    Snow
    57 minutes ago
    Yes
    ROAD ALERT:Silverthorne-Eisenhower/Johnson tunnelsNorth : from Lakewood to Silverthorne
    Road Work
    MM213
    MM260
    I-70 Northbound / Southbound from Lakewood to Silverthorne (Milemarker 213-260) (through June 2020)
    Install pavement markings on various highways regionwide
  • Eisenhower/Johnson tunnels-Georgetown
    Snow
    57 minutes ago
    Yes
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : mp 220*224
    Road Work
    MM220
    MM224
    I-70 Eastbound mp 220*224 (Milemarker 220-224) (through December 2019)
    Setting poles
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume)
    Road Work
    MM225.1
    MM225.1
    I-70 Eastbound / Westbound Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume) (Milemarker 225.1-225.1) (through November 2019)
    This is a maintenance project to repair the structure and improve safety of nine bridge in Denver, Adams, Jefferson, and Clear Creek counties. Work on this project includes: • Repairing bridge bearing in three bridges • Abutment and bridge rail repair in one bridge • Sandblasting, painting and sealing one bridge • Repairing slope paving and debris removal on a bridge • Anchor bolt and spall repair on a bridge, and • Removing trash and organic waste from tub girders and providing a new access point to these girders. The impacted structures are: • F-14-M on Water St. near I-70 (MP 225.1/ Silver Plume) in Clear Creek County • F-15-CI on US 40 at MP 2791.1(I-70 and Genesee) in Jefferson County • E-16-JJ on CO 58 at MP 5.4 (CO 58 and I-70) in Jefferson County • E-16-NJ on I-70 at MP 273.4 (Pecos and 48th) in Denver County • E-17-UP on I-70 at MP 274.5 (I-70 and Washington) in Denver County • E-17-IH and E-17 II on I-270 at MP 1.7 (I-270 and Brighton Blvd) in Denver County • E-17-UT on I-225 at MP 12 (I-70 and I-225) in Adams County • E-17-UG on 120th over I-76 at MP 17 in Adams County
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : Silver Plume, CO
    Road Work
    MM225
    MM226.6
    I-70 Eastbound / Westbound Silver Plume, CO (Milemarker 225-226.6) (through June 2020)
    Replacement of existing sound wall, ramp safety and drainage improvements
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : at Eisenhower Johnson Memorial Tunnels, east portal
    Road Work
    MM227.42
    MM250.78
    I-70 Eastbound / Westbound at Eisenhower Johnson Memorial Tunnels, east portal (Milemarker 227.42-250.78) (through October 2019)
    Overhead sign inspections
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : in Denver Metro Area
    Road Work
    MM228
    MM275
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 228-275) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : near Loveland Pass
    Road Work
    MM218.6
    MM229.8
    US 6 Eastbound / Westbound near Loveland Pass (Milemarker 218.6-229.8) (through October 2019)
    The project will include culvert replacement, milling and pavement overlay, guardrail replacement, and new pavement markings on 11.2 miles of US 6. The improvements are part of a statewide initiative to provide functional accessibility to all travelers using our State and US highways.
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : Near Granby
    Road Work
    MM219
    MM219
    US 40 Eastbound / Westbound Near Granby (Milemarker 219-219) (through September 2019)
    Guardrail repair
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Chains or alternative traction devices (ATDs) required for all CMV, including buses and vans of 16+ capacity.
  • Georgetown-Idaho Springs
    Dry
    57 minutes ago
    No
    ROAD ALERT:Georgetown-Idaho SpringsEast : on Stanley Road, just adjacent to the I-70 interchange at Exit 238 (Fall River Road/St. Mary's) from MP 238 to MP 238.9
    Road Work
    MM238
    MM238.9
    I-70 Eastbound / Westbound on Stanley Road, just adjacent to the I-70 interchange at Exit 238 (Fall River Road/St. Mary's) from MP 238 to MP 238.9 (Milemarker 238-238.9) (through January 2020)
    he project entails constructing a new two-lane vehicular bridge over Clear Creek which will connect Stanley Road to the Fall River Road/I-70 Exit 238 interchange. Approximately 845 feet of Stanley Road will be raised to line up with the new bridge. Other work includes adding guardrails and lighting, making drainage improvements, erecting signs and adding striping to the roadway at project completion.
    ROAD ALERT:Georgetown-Idaho SpringsWest : From the Veterans Memorial Tunnels to the Empire Junction
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Junction (Milemarker 232-247) (through April 2021)
    In July, CDOT and contractor, Graham U.S., will begin constructing a managed toll lane along the westbound lanes of I-70 from the Veterans Memorial Tunnels to Empire Junction. Similar to the eastbound lane already in use, this 12-mile long managed lane will feature traffic management systems to improve mobility and provide westbound drivers with a reliable, time-saving option during peak travel periods.
    ROAD ALERT:Georgetown-Idaho SpringsEast : in Denver Metro Area
    Road Work
    MM228
    MM275
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 228-275) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Georgetown-Idaho SpringsEast : near Loveland Pass
    Road Work
    MM218.6
    MM229.8
    US 6 Eastbound / Westbound near Loveland Pass (Milemarker 218.6-229.8) (through October 2019)
    The project will include culvert replacement, milling and pavement overlay, guardrail replacement, and new pavement markings on 11.2 miles of US 6. The improvements are part of a statewide initiative to provide functional accessibility to all travelers using our State and US highways.
    ROAD ALERT:Georgetown-Idaho SpringsWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
    ROAD ALERT:Georgetown-Idaho SpringsWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Chains or alternative traction devices (ATDs) required for all CMV, including buses and vans of 16+ capacity.
  • Idaho Springs-Genesee
    Dry
    57 minutes ago
    No
    ROAD ALERT:Idaho Springs-GeneseeWest : From the Veterans Memorial Tunnels to the Empire Junction
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Junction (Milemarker 232-247) (through April 2021)
    In July, CDOT and contractor, Graham U.S., will begin constructing a managed toll lane along the westbound lanes of I-70 from the Veterans Memorial Tunnels to Empire Junction. Similar to the eastbound lane already in use, this 12-mile long managed lane will feature traffic management systems to improve mobility and provide westbound drivers with a reliable, time-saving option during peak travel periods.
    ROAD ALERT:Idaho Springs-GeneseeEast : at Eisenhower Johnson Memorial Tunnels, east portal
    Road Work
    MM227.42
    MM250.78
    I-70 Eastbound / Westbound at Eisenhower Johnson Memorial Tunnels, east portal (Milemarker 227.42-250.78) (through October 2019)
    Overhead sign inspections
  • Genesee-C470
    Dry
    57 minutes ago
    No
    ROAD ALERT:Genesee-C470East : in Denver Metro Area
    Road Work
    MM258
    MM273
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 258-273) (through June 2020)
    Install pavement markings on various highways regionwide
  • Loveland Pass
    Snow
    57 minutes ago
    Yes
    ROAD ALERT:Loveland PassEast : mp 220*224
    Road Work
    MM220
    MM224
    I-70 Eastbound mp 220*224 (Milemarker 220-224) (through December 2019)
    Setting poles
    ROAD ALERT:Loveland PassEast : Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume)
    Road Work
    MM225.1
    MM225.1
    I-70 Eastbound / Westbound Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume) (Milemarker 225.1-225.1) (through November 2019)
    This is a maintenance project to repair the structure and improve safety of nine bridge in Denver, Adams, Jefferson, and Clear Creek counties. Work on this project includes: • Repairing bridge bearing in three bridges • Abutment and bridge rail repair in one bridge • Sandblasting, painting and sealing one bridge • Repairing slope paving and debris removal on a bridge • Anchor bolt and spall repair on a bridge, and • Removing trash and organic waste from tub girders and providing a new access point to these girders. The impacted structures are: • F-14-M on Water St. near I-70 (MP 225.1/ Silver Plume) in Clear Creek County • F-15-CI on US 40 at MP 2791.1(I-70 and Genesee) in Jefferson County • E-16-JJ on CO 58 at MP 5.4 (CO 58 and I-70) in Jefferson County • E-16-NJ on I-70 at MP 273.4 (Pecos and 48th) in Denver County • E-17-UP on I-70 at MP 274.5 (I-70 and Washington) in Denver County • E-17-IH and E-17 II on I-270 at MP 1.7 (I-270 and Brighton Blvd) in Denver County • E-17-UT on I-225 at MP 12 (I-70 and I-225) in Adams County • E-17-UG on 120th over I-76 at MP 17 in Adams County
    ROAD ALERT:Loveland PassEast : Silver Plume, CO
    Road Work
    MM225
    MM226.6
    I-70 Eastbound / Westbound Silver Plume, CO (Milemarker 225-226.6) (through June 2020)
    Replacement of existing sound wall, ramp safety and drainage improvements
    ROAD ALERT:Loveland PassEast : at Eisenhower Johnson Memorial Tunnels, east portal
    Road Work
    MM227.42
    MM250.78
    I-70 Eastbound / Westbound at Eisenhower Johnson Memorial Tunnels, east portal (Milemarker 227.42-250.78) (through October 2019)
    Overhead sign inspections
    ROAD ALERT:Loveland PassEast : in Denver Metro Area
    Road Work
    MM228
    MM275
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 228-275) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Loveland PassWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
    ROAD ALERT:Loveland PassWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Chains or alternative traction devices (ATDs) required for all CMV, including buses and vans of 16+ capacity.
  • Granby-Winter Park
    Dry
    12 minutes ago
    No
    ROAD ALERT:Granby-Winter ParkEast : mp 220*224
    Road Work
    MM220
    MM224
    I-70 Eastbound mp 220*224 (Milemarker 220-224) (through December 2019)
    Setting poles
    ROAD ALERT:Granby-Winter ParkEast : Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume)
    Road Work
    MM225.1
    MM225.1
    I-70 Eastbound / Westbound Various bridges in Denver, Clear Creek, Jefferson and Adams Counties This is for structure F-14 M on Water St. near I-70 in Clear Creek County (Silver Plume) (Milemarker 225.1-225.1) (through November 2019)
    This is a maintenance project to repair the structure and improve safety of nine bridge in Denver, Adams, Jefferson, and Clear Creek counties. Work on this project includes: • Repairing bridge bearing in three bridges • Abutment and bridge rail repair in one bridge • Sandblasting, painting and sealing one bridge • Repairing slope paving and debris removal on a bridge • Anchor bolt and spall repair on a bridge, and • Removing trash and organic waste from tub girders and providing a new access point to these girders. The impacted structures are: • F-14-M on Water St. near I-70 (MP 225.1/ Silver Plume) in Clear Creek County • F-15-CI on US 40 at MP 2791.1(I-70 and Genesee) in Jefferson County • E-16-JJ on CO 58 at MP 5.4 (CO 58 and I-70) in Jefferson County • E-16-NJ on I-70 at MP 273.4 (Pecos and 48th) in Denver County • E-17-UP on I-70 at MP 274.5 (I-70 and Washington) in Denver County • E-17-IH and E-17 II on I-270 at MP 1.7 (I-270 and Brighton Blvd) in Denver County • E-17-UT on I-225 at MP 12 (I-70 and I-225) in Adams County • E-17-UG on 120th over I-76 at MP 17 in Adams County
    ROAD ALERT:Granby-Winter ParkEast : Silver Plume, CO
    Road Work
    MM225
    MM226.6
    I-70 Eastbound / Westbound Silver Plume, CO (Milemarker 225-226.6) (through June 2020)
    Replacement of existing sound wall, ramp safety and drainage improvements
    ROAD ALERT:Granby-Winter ParkEast : at Eisenhower Johnson Memorial Tunnels, east portal
    Road Work
    MM227.42
    MM250.78
    I-70 Eastbound / Westbound at Eisenhower Johnson Memorial Tunnels, east portal (Milemarker 227.42-250.78) (through October 2019)
    Overhead sign inspections
    ROAD ALERT:Granby-Winter ParkNorth : from Lakewood to Silverthorne
    Road Work
    MM213
    MM260
    I-70 Northbound / Southbound from Lakewood to Silverthorne (Milemarker 213-260) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Granby-Winter ParkEast : in Denver Metro Area
    Road Work
    MM228
    MM275
    I-70 Eastbound / Westbound in Denver Metro Area (Milemarker 228-275) (through June 2020)
    Install pavement markings on various highways regionwide
    ROAD ALERT:Granby-Winter ParkEast : near Loveland Pass
    Road Work
    MM218.6
    MM229.8
    US 6 Eastbound / Westbound near Loveland Pass (Milemarker 218.6-229.8) (through October 2019)
    The project will include culvert replacement, milling and pavement overlay, guardrail replacement, and new pavement markings on 11.2 miles of US 6. The improvements are part of a statewide initiative to provide functional accessibility to all travelers using our State and US highways.
    ROAD ALERT:Granby-Winter ParkEast : Near Granby
    Road Work
    MM219
    MM219
    US 40 Eastbound / Westbound Near Granby (Milemarker 219-219) (through September 2019)
    Guardrail repair
    ROAD ALERT:Granby-Winter ParkWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Passenger vehicles are required to have snow or mud/snow tires, use chains/alternative traction devices, or be a 4WD/AWD vehicle.
    ROAD ALERT:Granby-Winter ParkWest : Loveland Pass
    Restriction
    MM220
    MM229
    US 6 Westbound / Eastbound Loveland Pass (Milemarker 220-229)
    Chains or alternative traction devices (ATDs) required for all CMV, including buses and vans of 16+ capacity.
  • I-70 to Winter Park (Berthoud Pass)
    Icy Spots
    57 minutes ago
    Yes
    ROAD ALERT:I-70 to Winter Park (Berthoud Pass)East : on Stanley Road, just adjacent to the I-70 interchange at Exit 238 (Fall River Road/St. Mary's) from MP 238 to MP 238.9
    Road Work
    MM238
    MM238.9
    I-70 Eastbound / Westbound on Stanley Road, just adjacent to the I-70 interchange at Exit 238 (Fall River Road/St. Mary's) from MP 238 to MP 238.9 (Milemarker 238-238.9) (through January 2020)
    he project entails constructing a new two-lane vehicular bridge over Clear Creek which will connect Stanley Road to the Fall River Road/I-70 Exit 238 interchange. Approximately 845 feet of Stanley Road will be raised to line up with the new bridge. Other work includes adding guardrails and lighting, making drainage improvements, erecting signs and adding striping to the roadway at project completion.
    ROAD ALERT:I-70 to Winter Park (Berthoud Pass)West : From the Veterans Memorial Tunnels to the Empire Junction
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Junction (Milemarker 232-247) (through April 2021)
    In July, CDOT and contractor, Graham U.S., will begin constructing a managed toll lane along the westbound lanes of I-70 from the Veterans Memorial Tunnels to Empire Junction. Similar to the eastbound lane already in use, this 12-mile long managed lane will feature traffic management systems to improve mobility and provide westbound drivers with a reliable, time-saving option during peak travel periods.
    ROAD ALERT:I-70 to Winter Park (Berthoud Pass)East : at Eisenhower Johnson Memorial Tunnels, east portal
    Road Work
    MM227.42
    MM250.78
    I-70 Eastbound / Westbound at Eisenhower Johnson Memorial Tunnels, east portal (Milemarker 227.42-250.78) (through October 2019)
    Overhead sign inspections